TESORO DISCOVERS LARGE GOLD BEARING VEIN SYSTEM AT THE BUZZARD PROJECT IN CHILE

Tesoro Resources announced on the 25th June 2020 that it has discovered a large Gold bearing system identified over an area of 1,100 metres and up to 750m wide and still open in all directions with individual veins of up to 250m in length. The Company said individual assays included 26m @ 1.62g/t Au including 8m @ 3.08g/t Au. Other results included grab samples across widths from 1 to 6m with grades of 1.16g/t Au and 7.06 g/t Au (details see ASX:TSO 25th June 2020).

The Company’s Managing Director said that at this early stage results from the Buzzard demostrates the potential of the El Zoro project, with the Buzzard emerging as a new Gold target within the El Zoro Gold Project. The exploration to date confirms a Gold mineralised system over 5 klms in length across Buzzard, Ternera and Toro Blanco prospects.

The Stock traded 17.7million shares today and rose 11% to $0.071c on the announcement today 25th June 2020.

Goldman

Read Previous

METEORIC RESOURCES – REVVING UP FROM BRAZIL TO THE KIMBERLEY’S

Read Next

BARDOC GOLD LIMITED GROWS THE APHRODITE PROJECT WITH GRADE AND WIDTH

Leave a Reply

Your email address will not be published. Required fields are marked *