Gold Price:

USD $4,127.96

AUD $5,919.86

  • October 6, 2026

ROBEX STRIKES 10M @ 30.10 G/T GOLD AT SABALI SOUTH

High-grade intercepts confirm strong mineralisation ahead of first gold in 2025

Robex Resources Inc (ASX:RXR) has released promising results from its Phase 1 pre-production grade control drilling program at the Sabali South deposit within the Kiniero Gold Project in Guinea, West Africa. The company is progressing towards its first gold pour at Kiniero in Q4 2025.

The program returned several shallow, high-grade gold hits that support strong mineralisation and continuity within zones targeted for early mining. Assay results revealed 11.15% more tonnes, a 3.08% higher grade, and 14.58% more contained ounces than previously estimated in the Mineral Resource model.

Drilling focused on in-situ mineralisation across laterite, mottled, and saprolite zones, forming the basis of Sabali South’s open-pit design.

Top intercepts from the program include:

  • 10m @ 30.10g/t Au from 12m in hole SSGC-440-01506
  • 24m @ 8.13g/t Au from 6m in hole SSGC-440-00790
  • 11m @ 11.12g/t Au from 8m in hole SSGC-440-01715
  • 8m @ 9.74g/t Au from 11m in hole SSGC-440-00224
  • 7m @ 12.06g/t Au from 13m in hole SSGC-440-02025

These results validate resource continuity and support mine planning ahead of scheduled production.

Robex’s Managing Director and CEO Matt Wilcox commented:
Phase 1 grade control drilling at Sabali South has delivered excellent results, confirming strong mineralisation and continuity across key zones. These high grades and thicknesses give us confidence as we move toward mining, with Kiniero firmly on track for first gold in Q4 2025.

Read the full announcement.

Vinkmag ad

Read Previous

STRONG GOLD INTERCEPTS CONTINUE AT VAN UDEN

Read Next

ANDY WELL STRIKE EXTENDED BY 450M WITH SHALLOW HIGH-GRADE GOLD HITS