Gold Price:

USD $4,006.78

AUD $5,847.03

  • November 12, 2026

PDI GOLD DRILLING RETURNS 28.35M AT 5.87G/T

Exploration drilling at Kiniéro returns high-grade sulphide intersections as PDI expands its 2027 program.

PDI Gold Limited (ASX:PDI) has reported initial results from deeper sulphide drilling at the Gobele and Jean deposits within its operating Kiniéro Gold Mine in Guinea.

The results cover a 51-hole, 14,671-metre program targeting extensions to mineralisation below and around the current resource envelopes at Gobele and Jean.

Selected intersections include:

  • 28.35m @ 5.87g/t Au from 155m (NEGDRCDD26-001)
  • 16m @ 7.55g/t Au from 144m and 7.1m @ 2.24g/t Au from 168m (NEGDDD26-005)
  • 12.8m @ 4.25g/t Au from 396.2m (JDD26-002)
  • 11m @ 3.99g/t Au from 185m (GDD26-004)
  • 4.8m @ 11.18g/t Au from 221.2m (JDD26-004)

All intervals are reported as downhole lengths. PDI said true widths will be refined through ongoing structural interpretation.

Drill plan for the Gobele and Jean deposits at Kiniéro
Drill plan showing recent results at the Gobele and Jean deposits. Source: PDI Gold.

PDI has seven diamond and two RC rigs operating at Kiniéro, with another RC rig being mobilised. The company said its 2027 exploration plan was being developed around approximately 1,800 holes for 140,000 metres.

The drilling forms part of work aimed at increasing Mineral Resources and extending mine life at Kiniéro, which achieved first gold pour in December 2025 and commercial production in February 2026.

PDI Gold managing director and chief executive officer Matthew Wilcox:

We are extremely encouraged by initial results we are seeing from exploration drilling at Kiniéro. This program is fundamental to our strategy of increasing Mineral Resources and extending mine life at Kiniéro to further cement its status as a world-class, long-life gold operation.

Initial drilling of deeper sulphide targets at Gobele and Jean has returned very positive results, confirming our geological models and highlighting the immense potential of this project.

We are ramping up the drilling fleet to advance our exploration objectives, and we look forward to delivering further updates as we continue to unlock the full value of the Kiniéro district. Our commitment to systematic brownfields expansion and targeted greenfields exploration reflects our confidence in the project’s future and our dedication to extending its production profile for years to come.

Read the full announcement.

Vinkmag ad

Read Previous

BULL OAK DRILLING RETURNS 265G/T GOLD

Read Next

MINDOOLAH DRILLING RETURNS SHALLOW HIGH-GRADE GOLD