USD $4,006.78
Final infill assays support resource confidence ahead of a planned 2027 restart
Maritana Minerals Limited (ASX:MRT) has reported final reverse circulation drilling results from its wholly owned Boorara Gold Project, 17km east of Kalgoorlie-Boulder in Western Australia.
The final 52 holes complete a 119-hole programme, part of Maritana’s approximately 60,000m resource conversion campaign across several deposits. Infill drilling better defined the contact lodes, while extension holes tested mineralisation below the planned southern pit.

- BOORD260054: 20m at 7.77g/t Au from 100m, including 2m at 54.04g/t Au from 114m.
- BOORD260149: 36m at 3.53g/t Au from 142m, including 1m at 62.44g/t Au from 156m. This hole was drilled down plunge beneath Pit 4.
- BOORD260056: 19m at 1.63g/t Au from 108m, including 1m at 5.25g/t Au from 115m.
- BOORD260100: 19m at 1.32g/t Au from 66m, including 1m at 6.67g/t Au from 71m.
- BOORD260119: 10m at 1.67g/t Au from 30m, including 1m at 9.08g/t Au from 37m.
Reported intersections are down-hole lengths, not true widths. BOORD260149 and BOORD260148 were deliberately drilled down plunge or dip to test extensions and investigate vein orientation; their intervals are not representative of the true width of the main contact lode.
Maritana said mineralisation remains open to the north and at depth. It is reinterpreting mineralisation wireframes ahead of an updated Boorara Mineral Resource Estimate due in the March 2027 quarter, followed by pit optimisation.
Boorara is planned as a key ore source for the Black Swan Processing Hub, with mining targeted to restart in mid-2027. Diamond drilling for mining assumptions and drill quality assurance is planned in the coming months, and grade control drilling is to precede open-pit production.
Managing Director and CEO Grant Haywood said:
These final results continue to build confidence in Boorara, with the infill drilling better defining the main contact lodes and indicating that gold mineralisation is wider in places than previously understood. Importantly, the down-plunge drilling beneath Pit 4 in the south of the Boorara system confirms mineralisation extends well below the current pit design and remains open at depth.