GREAT BOULDER INTERSECT HIGH GRADE GOLD UP TO 173 G/T GOLD AT MULGA BILL PROJECT

Great Boulder have intersected high grade gold in the “gap” zone between the Central and HGV resource areas.

6 Metres @ 30.96g/t Au from 113 metres including 1 metre at 173.50g/t Au.

Highlights include:

8 Metres @ 5.71g/t Au from 216 metres including 3 metres @ 13.84g/t Au.

7 Metres @ 4.94g/t Au from 129 metres.

The Company is on track to deliver updated Mineral Resource Estimates at the end of October 2023 for Mulga Bill and Iron Bark projects at the end of October.

Goldman

Read Previous

PAC GOLD ALICE RIVER PROJECT IDENTIFIES HIGH GRADE TARGET OVER 1.4 KILOMETRES STRIKE LENGTH AT THE POSIE PROSPECT

Read Next

LEONORA NEWLY ACQUIRED GWALIA ASSETS PAYING DIVIDENDS FOR GENISIS 34,066 OZ