Gold Price:

USD $4,165.18

AUD $5,964.39

  • October 7, 2026

GOLDARC EXTENDS HIGH-GRADE COVERAGE AT MT STIRLING WELL

Latest grade-control drilling includes 2 metres at 69.7g/t gold.

GoldArc Resources Limited (ASX:GA8) has extended high-grade coverage at the Mt Stirling Well deposit within its Leonora North Gold Project in Western Australia.

The fifth batch of grade-control results covers 85 reverse-circulation holes for approximately 2,245 metres. GoldArc said the programme is feeding into mine planning for Mt Stirling and Mt Stirling Well.

The company reported the following downhole intersections:

  • 2m at 69.7g/t Au from 23m, including 1m at 137.0g/t Au from 23m in 26BSWRC906
  • 1m at 29.5g/t Au from 24m in 26BSWRC1044
  • 1m at 10.9g/t Au from 27m in 26BSWRC1062
  • 1m at 8.72g/t Au from 22m in 26BSWRC1042
  • 2m at 4.95g/t Au from 24m, including 1m at 7.59g/t Au from 24m in 26BSWRC993

All reported widths are downhole widths and true widths are not stated.

Plan view of grade-control RC drilling and the block model at Mt Stirling Well
Plan view of grade-control RC drilling and the block model at Mt Stirling Well. Source: GoldArc Resources.

The programme is funded by BML Ventures under a 50:50 net profit share arrangement, while GoldArc retains 100% ownership of Mt Stirling and Mt Stirling Well. Remaining assays are pending and a further approximately 6,600 metres of reverse-circulation drilling is planned to start in August.

GoldArc managing director Paul Stephen:

Mt Stirling Well has now returned high-grade results in five consecutive batches, and this batch includes the best intercept we have recorded at the deposit. What matters for shareholders is that this is close-spaced data going straight into the mining models, and BML Ventures is funding all of it. We are in the final phase of the program with mine planning underway.

Read the full announcement.

Vinkmag ad

Read Previous

DESERT MINERALS STARTS PROVIDENCE GOLD DRILLING

Read Next

MUSIC WELL DRILLING HITS HIGH-GRADE GOLD SHOOT