Gold Price:

USD $4,165.18

AUD $5,964.39

  • October 7, 2026

DRILLING COMPLETED AT SANDSTONE GOLD PROJECT

Aurumin Resources advances exploration at Central Sandstone

Aurumin Limited (ASX:AUN) has completed a 1,147m reverse circulation (RC) drill programme at its 100%-owned Central Sandstone Project, located 520km northeast of Perth. The project, which includes three granted Mining Licences, a 500ktpa CIL processing plant (requiring refurbishment), and additional facilities, has a resource base of 0.9Moz gold.

Highlights:

  • 1,147m RC drill programme completed
    • Samples are being finalised and will be sent to the laboratory, with results expected in early 2025.
    • Further drilling campaigns are scheduled for Q1 2025.
  • Drilling targeted resource extensions and infill at Plum Pudding (14koz Au) and Shillington Deposits (91koz Au).
  • High-grade drill results from Plum Pudding (follow-up drilling):
    • 18m @ 25.80g/t Au from 30m (hole SN_XP_RC_24_0036).
  • Priority exploration targets at Shillington:
    • Controls for high-grade mineralisation interpreted.
    • Untested BIF-hosted structural target evaluated.

Daniel Raihani, Managing Director of Aurumin, stated:

I am pleased that we have been able to complete this drilling programme which marks the end of a busy quarter for the team. I look forward to receiving results early in 2025.

Drill Rig onsite at Central Sandstone.

Read the full announcement.

Vinkmag ad

Read Previous

SHALLOW GOLD AND KEY HOST ROCK INTERSECTED EAST OF FOSTER MINE

Read Next

LEEUWIN METALS ACQUIRES MARDA GOLD PROJECT IN WA