USD $4,165.18
Cassini hits pay dirt in the first three holes at the Handpump Gold Prospect at the Mount Squires Project.
The intersections include 20m @ 1.27g/t Au from 23m including 7m @ 2.54g/t Au fm 23m depth. The drilling is the start of a 10 hole drilling program. The results from the first three holes combined with previous drilling, the Company says, has the potential for a 600m strike length. The other two holes, of the three first holes drilled, returned grades of around 2m @ 0.66g/t Au. Previous drilling at the Handpump Prospect returned 15m @ 2.30g/t Au from only 31m depth.
Cassini Managing Director Mr Richard Bevan says, he is really encouraged by these first results at the Handpump Prospect. The results, he says, confirm the possibility of near surface oxide Gold mineralization and looks forward to drilling beneath these current results.
