Gold Price:

USD $4,006.78

AUD $5,847.03

  • November 12, 2026

AURUM LIFTS BOUNDIALI GOLD RESOURCE TO 3.84MOZ

Boundiali’s Indicated gold resource climbs 37% as the definitive feasibility study advances

Aurum Resources Limited (ASX:AUE) has increased the Mineral Resource at its Boundiali Gold Project in Côte d’Ivoire by 19% to 3.84 million ounces of gold at 1.0 grams per tonne.

The updated estimate comprises 71.5 million tonnes at 1.0g/t gold for 2.33 million ounces in the Indicated category and 53.6 million tonnes at 0.9g/t gold for 1.50 million ounces in the Inferred category.

Indicated ounces increased by 630,000 ounces, or 37%, after infill drilling at BST1, BMT1 and BMT3 converted 620,000 ounces from Inferred to Indicated status. Boundiali’s seventh defined deposit, BMT2, contributed a maiden resource of 4.4 million tonnes at 0.9g/t gold for 130,000 ounces.

Boundiali Gold Project resource and prospect map
Boundiali Gold Project map showing the seven deposits with defined Mineral Resources and surrounding prospects. Source: Aurum Resources.

The existing Probable Ore Reserve remains unchanged at 42.1 million tonnes at 0.9g/t gold for 1.21 million ounces because it is based on the April 2026 resource. Aurum plans to update the reserve through the definitive feasibility study targeted for late 2026.

The company said drilling remains under way as part of an expanded 150,000-metre 2026 program, while environmental approval has been granted and Mining Licence applications are progressing. First gold is targeted for the first half of 2028, subject to the study, approvals and a final investment decision.

Aurum reported more than A$95 million in unaudited cash at 30 September. Its combined resource across Boundiali and the Napié Gold Project now stands at 5.00 million ounces.

Aurum Resources managing director Dr Caigen Wang:

This MRE update represents another step change at our Boundiali Gold Project, headlined by a 37% increase (+630,000oz) in Indicated Resources to 2.33 Moz gold and a maiden Mineral Resource at BMT2.

This was a deliberate drilling campaign. We directed our rigs at BST1, BMT1 and BMT3 to convert Inferred Resources into Indicated, so we can convert Indicated Resources into Ore Reserves. This plan has delivered, and we expect it to support growth in our Ore Reserve update as part of the DFS later this year.

At the same time, we have added an entirely new deposit to the MRE inventory. BMT2 is the seventh deposit to carry a Mineral Resource at Boundiali, and it was a greenfield target not long ago. It is a reminder that this belt keeps delivering, and that we have drilled only the most obvious of our targets to date.

This MRE increase is a direct testament to our unique operational model. By owning and operating our own fleet of 16 diamond drill rigs, we have grown Boundiali from a greenfield discovery to a 3.84 Moz gold asset in approximately 35 months, and increased our CY2026 drill program to 150,000m. Our Group Resource base now stands at 5 Moz gold.

With more than A$95 million in cash and our own rigs, we are running drilling, studies and permitting concurrently. Environmental approval for Boundiali was granted in May 2026, and we delivered the Pre-Feasibility Study and Maiden Ore Reserve in June 2026. Our focus now is securing grant of the Mining Licences and completing the DFS, ahead of a final investment decision and the start of construction, targeting first gold in H1 CY2028.

We remain committed to rapidly expanding our resource base and delivering significant value to our shareholders as we cement Boundiali’s status as a premier West African gold project.

Read the full announcement.

Vinkmag ad

Read Previous

PERSEUS PRODUCES 92,551OZ IN SEPTEMBER QUARTER

Read Next

PILBARA GOLD EXTENDS MT YORK MINERALISATION AT DEPTH