USD $4,006.78
First hole in the new Apollo program returns a broad gold interval
Amara Minerals Limited (ASX:AM3) has reported the first assay result from its current diamond drilling program at the 100%-owned Apollo Gold and Antimony Project in central Victoria.
Hole AA2601 was one of the first three holes completed in the program, which has so far covered 862.5 metres. The initial holes are targeting the upper Dig Fault Zone to extend and increase the higher-grade core of the mineralisation ahead of evaluating a potential maiden Mineral Resource Estimate.
Results from AA2601 include:
- 57.5 metres at 2.62g/t gold from 139.5 metres.
- Including 20 metres at 5.13g/t gold from 139.5 metres.
- Including 10 metres at 8.04g/t gold from 141.0 metres.

The interval is reported as drilled width. Based on the interpreted orientation of the Dig Fault Zone, Amara estimates true widths of approximately 20 metres for the broad intercept and 7 metres for the higher-grade core.
Assays for holes AA2602 and AA2603 have not yet been received, while drilling of AA2604 is in progress. A further three holes totalling approximately 2,000 metres are planned to test the Dig Fault Zone below the currently drilled levels. No Mineral Resource has been estimated for Apollo at the date of the announcement.
Amara Minerals managing director Ian Holland:
The first hole at Apollo has returned 57.5 metres at 2.62 grams per tonne gold, with a higher-grade core of 20 metres at 5.13 grams per tonne. That is the width and grade we need to see to support a maiden Mineral Resource at Apollo. Two more holes are at the laboratory, and the rig is now testing the Dig Fault Zone at depth, where mineralisation remains open.
